← Back to Engineering & ResearchODD RECOVERY / INVENTION 04
ODD R&D / Engineering concept · No. 04

ODD
Recovery.

ODD Recovery is an EV fire response concept focused on vehicle recovery, containment, and reopening blocked roadways.

A mobile containment concept for electric-truck battery fires.

THE RECOVERY TRAILER · CONCEPT VISUALIZATION

ODD Recovery is a proposed towable enclosure for recovering an electric truck affected by a battery fire. It combines winch loading, continuous vacuum extraction, camera-guided foam and sand placement, and direct liquid-nitrogen spraying. Cooling and gas management would continue while the enclosed vehicle travels to a dedicated containment center.

<45 minDeparture-readiness targetFrom recovery-unit arrival
53 ftMaximum container lengthExcludes the towing tractor
1 hourCleanup & reopening goalProjected public benefit

Development targets, not demonstrated performance. This concept report is not a field operating procedure.

Invention highlights

One platform.
Three connected goals.

01 / THE CONCEPT

Move sustained treatment
off the freeway.

An enclosed recovery platform designed to carry cooling, gas treatment and the damaged tractor together.

The concept responds to the prolonged freeway disruption illustrated by KTVU FOX 2 coverage of a Tesla Semi fire on I-880 in Hayward. Its proposed benefit is to move sustained cooling, residue retention, and gas treatment into equipment that can accompany the damaged vehicle. Road reopening would also depend on incident command, debris removal, pavement condition, and other scene requirements. KTVU report ↗

The current layout accommodates the damaged Tesla tractor, with its cargo trailer detached. The recovery enclosure is carried by a trailer and pulled by a separate towing tractor. The 53-foot limit below applies to the recovery container body, excluding that towing tractor.

One fixed enclosure. Consistent geometry.

ElementDesign requirement
Recovery container body lengthNo more than 53 feet, approximately 16.15 meters
Height allowanceApproximately 24 inches, or 0.61 meters, above the Tesla tractor height
Total width allowance16 inches, or approximately 406 millimeters, beyond the Tesla tractor width
Distribution of width allowance8 inches, or approximately 203 millimeters, on each side
Container wallsFixed geometry and consistent dimensions throughout the operating sequence
Damaged tractorOriginal cab proportions, wheelbase, axle positions, and battery envelope retained
Equipment arrangementFront equipment bay, front bulkhead winch, rear loading ramp, and fixed treatment hardware locations

For the visual concept, the added height and width are treated as clear space around the tractor. Detailed drawings must separately account for insulation, wall structure, roof equipment, and the resulting external dimensions. The actual tractor envelope must be measured before finalizing the enclosure.

Tesla’s rescue sheet locates the main high-voltage battery beneath the cab. The battery must not be lengthened along the rear chassis to make treatment equipment easier to illustrate. Its location and the tractor’s proportions remain fixed in every view. Tesla Semi rescue sheet ↗

02 / SIX-STAGE SEQUENCE

From loading to containment.

The proposed sequence pairs controlled loading and atmosphere management with localized treatment, direct liquid-nitrogen cooling, and monitored transport.

STAGE 01

Load the tractor

A rear ramp provides access to the enclosure. A winch mounted at the front bulkhead draws the damaged tractor into the loading bay, with remote operation keeping personnel outside the loading path. The concept requires a recovery method suitable for the tractor’s damaged wheels, brakes, and structure; it does not assume that a burned vehicle can roll normally.

Design considerations

After loading and securing the tractor, the enclosure closes for controlled treatment. The ramp, restraints, floor, and winch require load calculations based on the recovered vehicle and recovery forces.

STAGE 02

Extract & locate

Continuous vacuum extraction draws smoke and released gases into a treatment system. Thermal cameras identify accessible hot surfaces, while visible-light cameras and work lights support positioning and inspection. A rail-mounted positioning system, similar in motion to a laser cutter, directs treatment tools toward identified regions.

Design considerations

Extraction is intended to manage the chamber atmosphere and remove emitted gases and associated heat. It does not discharge the cells or establish that internal thermal runaway has stopped. Operating pressure remains a design variable, and the enclosure must be engineered for the pressure differences it will experience. Camera readings describe visible surfaces; they do not directly measure every cell interior.

STAGE 03

Foam, then sand

Foam is applied to selected hotspots, followed by dry, electrically insulating sand over the treated locations. Application remains localized so that the vehicle is not buried and the original battery enclosure remains accessible where cooling is needed.

Design considerations

Foam formulation, sand specification, placement, and quantity must be selected together. The combined layer could obstruct later heat transfer, so the full foam–sand–nitrogen sequence must be evaluated as a system. Neither agent is assumed to repair an internal cell short.

STAGE 04

Spray liquid nitrogen

The vacuum stage stops, and insulated tanks supply nitrogen that is already liquid to a nozzle manifold. The nozzles spray the original battery enclosure and accessible affected regions. Nitrogen absorbs heat as it boils and as its cold vapor warms.

Design considerations

The concept does not rely on changing the pressure of warm nitrogen inside the container to produce liquid. A regulated exhaust path and independent pressure protection remain available during nitrogen application. Liquid nitrogen expands substantially on vaporization, so a closed enclosure cannot be treated as an unvented vessel. Compressed Gas Association guidance ↗

STAGE 05

Verify sustained cooling

Monitoring continues during treatment. The controller must assess temperature trends, potential internal hotspots, gas conditions, chamber pressure, and remaining nitrogen supply. A cold enclosure or disappearance of visible flames alone is not the departure criterion.

Design considerations

Departure criteria must account for the damaged battery, the intended journey, delays, and loss of cooling or power. They require validation before the system can be used to authorize transport.

STAGE 06

Transport to containment

The tractor remains enclosed and secured while cooling, monitoring, and gas treatment continue during transport. The container retains contaminated sand, foam, condensate, and other residues. The receiving center takes over sustained treatment and controlled handling before onboard resources are exhausted.

03 / CURRENT LIMITATIONS

Why battery fires can
keep a freeway closed.

Current roadside response can demand large quantities of water, prolonged cooling, smoke precautions, and a long wait before the truck can be moved. These are the limitations ODD Recovery is intended to address.

UP TO 18 hours INITIAL BATTERY-FIRE ESTIMATE
I-880 / Hayward · Covered by KTVU FOX 2

During the I-880 incident covered by FOX, CHP initially estimated the battery fire could burn for 15–18 hours, with southbound lanes expected to remain closed until the fire was out.

This was the early forecast, not the final measured closure duration.

01 / WATER DEMAND

Thousands of
gallons of water.

Sustained battery cooling can require substantial water supplies. In a separate 2024 Tesla Semi fire on I-80, the NTSB reported about 50,000 gallons used to extinguish flames and cool the batteries—a documented example of the demand such an incident can create.

NTSB incident report ↗
02 / TRAFFIC DISRUPTION

Hours of
stopped traffic.

A blocked freeway interrupts commutes and freight movement, while traffic must wait or divert. Both directions of I-880 were initially closed during the Hayward fire; southbound lanes remained closed into the early morning.

Closure and reopening report ↗
03 / THERMAL RUNAWAY

Heat that spreads.
A risk of reignition.

Uncontrolled heating in one cell can heat neighboring cells and spread the failure. Visible flame suppression alone does not eliminate the risk of reignition, so cooling, assessment, and monitoring may need to continue.

U.S. Fire Administration ↗
04 / SMOKE & AIR QUALITY

Hazardous smoke.
Public air-quality concerns.

Smoke exposure can prompt public alerts, access restrictions, and air-quality monitoring. CHP cited the potential hazard from chemical smoke when closing I-880 in both directions. The NTSB also documented air-quality measurements in the separate I-80 response.

Hazardous-smoke closure report ↗
05 / RESPONSE DURATION

Long firefighting
and monitoring periods.

Responders may need to sustain cooling and reassess battery conditions after flames are suppressed. Continued monitoring for renewed heating or ignition extends the response and keeps personnel and equipment committed to the scene.

Cooling and post-fire monitoring ↗
06 / DELAYED REMOVAL

The truck remains.
The freeway waits.

A damaged truck may remain at the incident site for hours while conditions are assessed for recovery. In the separate I-80 case, lane closures lasted 14–15 hours while crews cooled the batteries for recovery and protected the surrounding area.

NTSB recovery timeline ↗
The purpose of ODD Recovery

Bring cooling, gas management, and transport into one enclosed platform so sustained treatment can continue after the vehicle leaves the freeway.

The under-45-minute departure target and one-hour cleanup and reopening goal remain development targets.
04 / ENVISIONED OUTCOMES

Recovery in motion.

Concept scenes show the intended outcome: enclosed transport, ongoing cooling, and a shorter disruption for commuters.

Cooling during transport

The closed trailer travels with traffic while cooling and gas treatment continue. The inset illustrates the battery enclosure; it is not a measured temperature record.

Flames out. Cooling continues.

The proposed outcome shows no visible flames at the damaged battery enclosure, while cooling and monitoring remain active.

Projected outcome

One-hour cleanup.
One-hour traffic reopening.

The ambition is to return the freeway to service while sustained treatment continues in containment.

Illustrative comparison: a one-hour reopening goal versus an 18-hour closure scenario.

The one-hour goal is separate from the under-45-minute departure-readiness target. The 18-hour comparison is illustrative; it does not establish the actual duration of the FOX-reported incident or a demonstrated time saving. Road reopening remains dependent on incident command and scene conditions.

05 / CONTACT & COLLABORATION

Let's develop the
next stage of recovery.

Connect with Areg Akopyan about engineering, manufacturing, or investment in the ODD Recovery concept.

Concept originator

Areg Akopyan

Los Angeles, California

The next phase brings the enclosure, cooling system, monitoring, and recovery process together for engineering development and validation.

PROJECTODD RecoveryDEVELOPMENT STAGEConcept & engineering assessmentFOCUSMobile EV battery-fire containment
Contact Areg Akopyan Explore the invention portfolio ↗
Start a focused conversation

What would you like to discuss?

Thermal modeling, battery behavior, sensing, gas treatment, and system validation.

Personalize this introduction, copy it, and use it on Areg's contact page.

Open contact page ↗

A shared development goalLess time on the freeway.
More control through recovery.

Revisit the six-stage concept ↑

Sources & image notes

  1. KTVU FOX 2 — Tesla Semi fire coverage ↗
  2. Tesla — Semi emergency response rescue sheet ↗
  3. NTSB — Electric-vehicle battery fire safety study ↗
  4. Compressed Gas Association — Refrigerated and cryogenic liquid safety ↗
  5. NTSB — 2024 Tesla Semi fire, water use and recovery timeline ↗
  6. U.S. Fire Administration — Lithium-ion fire risks and response ↗
  7. Bay City News / SFGATE — Initial 15–18-hour CHP estimate ↗
  8. ABC7 / Bay City News — I-880 closure and reopening ↗

Ten AI-generated concept illustrations: six comic stages and four high-definition scenes. The downtown Los Angeles wallpaper is an AI-generated cityscape shown at 25% opacity. Illustrations are presentation visuals, not incident photographs or dimensioned engineering drawings. Trailer geometry and battery placement remain fixed design requirements.